Skip to content

December 2011

  • The Geo-Marine Technology team is currently working in the Desktop study for the TPKM-3 fiber optical cable (Taiwan). GMT in consortium with Williamson & Associates, Dragon Prince ltd., and Geoguide of Taiwan has been awarded the contract to conduct the survey for the planned TPKM-3 cable survey by NEC of Taiwan.